Data center site requirements.

A practical starting point for landowners and brokers with a property that may support digital infrastructure.

There is no single acreage or power threshold that fits every data center. Project scale, operator needs, and delivery schedules vary. Our preliminary screen looks at five connected pieces—and what is known about each.

Explore the five criteria ↓
01 / SITE CRITERIA

Land

Room to build. A practical path to control.

Gross acreage is a starting point. The more useful question is how much land can accommodate buildings, equipment, access, setbacks, and potential expansion. Property shape, slopes, wetlands, flood areas, and easements all influence that answer.

What to share

  • Location, parcel boundaries, and gross acreage
  • Estimated usable acreage and known site constraints
  • Road access, ownership, and the path to purchase or control
  • Adjacent parcels or room for future expansion
02 / SITE CRITERIA

Power

A credible path to capacity and timing.

Nearby transmission lines or a substation can make a property worth investigating. They do not establish that the site has available electric capacity. A site-specific conversation with the serving utility is needed to understand potential service, upgrades, and delivery timing.

What to share

  • Serving utility and any utility contact or correspondence
  • Requested or confirmed capacity, in megawatts, if known
  • Status of utility discussions, studies, and required upgrades
  • Expected timing and whether capacity would arrive in phases
03 / SITE CRITERIA

Connectivity

Connections that can support resilient operations.

Fiber near a property is a useful lead. Provider confirmation is needed to establish whether service can reach the site. Where resilience matters, separate physical routes deserve attention alongside the number of available carriers.

What to share

  • Known fiber providers and nearby routes
  • Existing service or the status of provider discussions
  • Potential extension requirements
  • Any information about physically distinct connection routes
04 / SITE CRITERIA

Infrastructure

The supporting services a project would need.

Road access, water, wastewater, and other services should be considered in light of the proposed development. Water needs depend on the facility and cooling approach. Existing infrastructure and service availability are separate questions; identify what has been confirmed and what still needs review.

What to share

  • Road access and any known improvement needs
  • Water and wastewater providers, service, and constraints
  • Other relevant utilities, including gas if contemplated
  • Available surveys, utility maps, or infrastructure studies
05 / SITE CRITERIA

Approvals

A workable route through local requirements.

Current zoning, permitted uses, environmental conditions, and community context shape the development path. Distinguish approvals already in place from those that would still be required. Generator noise, lighting, setbacks, and neighboring uses can also affect project planning.

What to share

  • Current zoning and known permitted-use requirements
  • Potential rezoning, special approvals, or permit needs
  • Known environmental, floodplain, or title constraints
  • Prior studies and discussions with local officials
BEFORE YOU SUBMIT

Start with what you know.

You do not need a complete development package to bring a potential site forward. Estimates are welcome when clearly identified, and unconfirmed technical details can remain blank.

Have the property location, approximate acreage, your relationship to the property, and contact information ready. Mention any utility correspondence, parcel maps, surveys, or studies you already have so they can inform a follow-up conversation.

A few common questions.

Is there a minimum acreage?

We do not use a single published minimum for every submission. Usable area, site configuration, infrastructure, and the type of project all matter. Share the acreage and any known constraints.

Can I submit without confirmed power?

Yes. Identify the serving utility and what you know, and clearly distinguish nearby infrastructure from utility-confirmed capacity. Missing information can be part of the preliminary review.

Will my property be listed publicly?

There is no public listing of submitted sites. Information is submitted for confidential preliminary review under our privacy and submission terms.

What happens after submission?

We review the information and contact the submitting party when a site warrants a closer conversation. A submission does not create an agency relationship, an offer to purchase, or a commitment to pursue the property.